| 数据搜索系统,热门电子元器件搜索 |
|
SMBPV..C 数据表(PDF) 3 Page - Banner Engineering Corp. |
|
|
|||||||||||||||||||||||||||||
SMBPV..C 数据表(HTML) 3 Page - Banner Engineering Corp. |
|
3 / 8 page ![]() Mounting The wide beam pattern of PVD sensors simplifies their alignment. M4 stainless steel fasteners and two stainless steel brackets are included with each sensor. Mount the sensor and its reflector, if used, parallel to one another in the same plane, and their tops and bottoms aligned. 1. From a common point of reference, make measurements to locate the sensor and its reflector, if used, in the same plane with their midpoints directly opposite each other. 2. Mount the included brackets to the top and bottom of each sensor, as shown. 3. Mount the sensor in its brackets and the reflector, if used, being careful to position the sensor's red lenses directly facing the reflector. 4. Measure from one or more reference planes (for example, the building or bin floor) to the same point(s) on the emitter and receiver to verify their mechanical alignment. (If the sensors/reflectors are mounted exactly vertical or horizontal, a carpenter’s level may be helpful. A straightedge or a string extended between the sensor and the bin wall may also be helpful.) 5. Also check “by eye” for line-of-sight alignment. 6. Make any necessary final mechanical adjustments, and hand-tighten the bracket hardware. 7. After the electrical hookup is complete, check for beam alignment. If necessary, re-align the emitter and receiver at that time. Figure 5. PVD Mounting Hardware Wiring All models feature integral 2 m (6.5 ft) long, 3.3 mm (0.13 inch) diameter PVC-jacketed cables. Models whose model numbers end in “Q” are terminated with quick-disconnect (QD) Euro-style 5-pin connectors; other models have unterminated ends. Optional mating QD cables are available. Either 4-pin or 5-pin QD cables may be used; the center pin of a 5-pin cable (gray wire, pin 5) is unused in normal operation. Wiring is functionally identical for cabled and quick-disconnect models. NPN (Sinking) Output PNP (Sourcing) Output Key Job Light Control Not Used 2 5 12-30V dc – + 1 3 4 Load 12-30V dc Job Light Control Not Used – + 1 3 2 4 5 Load 1 = Brown 2 = White 3 = Blue 4 = Black 5 = Gray See Configuration on page 3 for job light control input requirements. Configuration To configure the PVD, set the DIP switches as shown, using the supplied plastic screwdriver to avoid damaging the switches or causing a short circuit. Cover Removal Cover Replacement PVD Series Parts Verification Sensor P/N 113230 Rev. G www.bannerengineering.com - Tel: +1-763-544-3164 3 |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |