| 数据搜索系统,热门电子元器件搜索 |
|
DEV-KIT 数据表(PDF) 39 Page - List of Unclassifed Manufacturers |
|
|
|||||||||||||||||||||||||||||
DEV-KIT 数据表(HTML) 39 Page - List of Unclassifed Manufacturers |
|
39 / 53 page ![]() 4116369 Rev 9.0 September 04, 2017 39 5. Design Guidelines 5.1. Power-Up Sequence Apply a low-level logic to the PWR_ON_N pad (pad 59); within approximately 25ms, VGPIO will appear to be at 1.8V. Either UART1 or the USB interface could be used to send AT commands. The AT command interface is available in about 7 seconds after PWR_ON_N for either UART1 or USB. When using UART1, the AT command interface is available after the transition of UART1_CTS from high to low level. When using a USB connection, the HL7548 and HL7588 will start communicating with the host after USB enumeration. The time when AT commands can be sent will depend on the initialization time on the USB host. Module is ON Module is OFF 2000 ms <25 ms 7 secs Module is ready to receive AT commands via UART1 Signal level depends on Hardware Flow Control settings PWR_ON_N VGPIO UART1_CTS Figure 8. PWR_ON_N Sequence with VGPIO Information Note: As PWR_ON_N is internally pulled up with 100kΩ, an open collector or open drain transistor must be used for ignition. The PWR_ON_N pad has the minimum assertion time requirement of 25ms, with LOW active. Once the valid power on trigger is detected, the PWR_ON_N pad status can be left open. The maximum inrush current is 1.3 A and lasts less than 1.5 ms. |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |