| 数据搜索系统,热门电子元器件搜索 |
|
USBTO232+ 数据表(PDF) 2 Page - Maxim Integrated Products |
|
|
|||||||||||||||||||||||||||||
USBTO232+ 数据表(HTML) 2 Page - Maxim Integrated Products |
|
2 / 8 page ![]() 4) Connect a 9V to 15V DC power source to the µC module at the terminal block located next to the on/off switch, in the upper-right corner of the µC module. Observe the polarity marked on the board. 5) Connect a cable from the computer’s serial port to the µC module. If using a 9-pin serial port, connect a straight-through, 9-pin female-to-male cable. If the only available serial port uses a 25-pin connector, a standard 25-pin to 9-pin adapter is required. The EV kit software checks the modem status lines (CTS, DSR, DCD) to confirm that the correct port has been selected. 6) Start the MAX1110 program by opening its icon in the Program Manager (or Start Menu). 7) The program prompts you to connect the µC mod- ule and turn its power on. Slide SW1 to the ON posi- tion. Select the correct serial port, and click OK. The program automatically downloads KIT1110.L11 to the module. 8) Apply input signals to the CH0–CH7 inputs at the right edge of the MAX1110 EV kit board. Observe the readout on the screen. Evaluating the MAX1112 To evaluate the MAX1112, turn off power to the kit, replace U1 with a MAX1112CPP, and set VDD to 5V by adjusting trim pot R2 on the 68L11D module. No other hardware changes are necessary. Start the MAX1110 software, and change the assumed reference voltage from 2.048V to 4.096V. Refer to the section Changing the Reference Voltage. __Detailed Description of Software Shutdown Power Cycling To reduce average supply-current demand, the MAX1110 can be shut down between conversions. From the Power menu, select Full Power-Down mode. The amount of power savings depends primarily on how long the part is off between conversions. The accuracy of the conversions depends on the power-up delay, the reference capacitor, and the time in power- down. Adjust the off-time with the Delay Between Samples command. Adjust the on-time with the Power- Up Delay command. Using an adequate power-up delay ensures conversion accuracy during power-cycling modes. The reference must be allowed enough time to stabilize before the measurement is performed. The Power-Up Delay com- mand controls the power-up delay. Increase the delay until no further change in accuracy is observed. The power-up delay requirement depends on the value of the reference capacitor (C9) and the off-time (delay between samples). The MAX1110 EV kit software performs power-up by starting a conversion and discarding the reading. When the power-up delay is complete, the reference voltage is correct, and an accurate measurement can be per- formed. Measuring Supply Current On the EV kit board, the MAX1110 draws all its power through jumper JU5, which is wired closed when the board is shipped from the factory. To measure the MAX1110’s supply current, modify the board (with the power off) by cutting jumper JU5 and connecting a cur- rent meter across JU5. Low-Speed Data Logging The RS-232 serial link limits the data-logging sample rate to no more than 10 samples per second. The Log menu can be used to write data to a user-specified file in comma-spaced-value text format. From the Log menu, select Select Channels, and select the channels you want to log. Next, pick the New Log File command from the Log menu. Once a log file has been opened, it can be paused or resumed with the Pause command. One complete line of data is written after all enabled channels have been sampled. The first line of the log file contains the column headings. Each subsequent line of the log file contains all enabled channels, sepa- rated by commas, tabs, or spaces. The program con- tinues to write data to the log file until the Done com- mand is selected from the Log menu. High-Speed Data Sampling For sampling rates up to 5ksps, the high-speed sam- pling commands can be used. Data can be collected from any single channel at high speed, using the com- mands on the Sample menu. First, select the number of samples. Then, set the sampling rate by inserting a delay between samples, or choosing one of the preset sample rates. To begin collecting data, use the Collect command. After the samples have been collected, the data is automatically uploaded to the host and is graphed. The data can optionally be saved to a file. Changing the Reference Voltage The MAX1110 EV kit software assumes a 2.048V refer- ence voltage, unless otherwise specified. To change the reference voltage assumption, use Set Reference Voltage under the Device menu. MAX1110 Evaluation System/ Evaluation Kit 2 _______________________________________________________________________________________ |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |