| 数据搜索系统,热门电子元器件搜索 |
|
ACM3P-4-AC1-R-C 数据表(PDF) 3 Page - Murata Power Solutions Inc. |
|
|
|||||||||||||||||||||||||||||
ACM3P-4-AC1-R-C 数据表(HTML) 3 Page - Murata Power Solutions Inc. |
|
3 / 6 page ![]() 2P-A > 3P-A > 2P > 3P Where: 2P-A enables continuous auto-scrolling 2-phase operation 3P-A enables continuous auto-scrolling 3-phase operation 2P enables fixed 2-phase operation 3P enables fixed 3-phase operation To enable the desired mode of operation, simply stop pressing the SEL switch after the desired mode is displayed. The unit will begin normal operation in the selected mode five seconds after the last SEL switch activation. 3. Overrange Indication: ACM3P ammeters have an overcurrent rating of 1.5 times rated current, or 150A. However, accuracy is only guaranteed up to 100A, and the display will flash on and off when the current is at or above 120A. 4. Calibration: Due their digital design, ACM3P ammeters cannot be cali- brated in the field. ACM3P ammeters are factory-calibrated to meet their specified accuracies with the factory supplied current transformers. Use of any other current transformers will produce significant errors. Contact Murata Power Solutions if additional information is required regarding calibration, setup, or any other technical issue pertaining to ACM3P ammeters. 5. Wiring: All power supply and load wiring must be rated for the voltages and currents they will carry and must comply with any code or applica- tion-mandated requirements pertaining to the user’s specific installation. 6. Supply Fusing, and Grounding: Wires specified in the Functional Specifications section must be used for making connections to ACM3P series ammeters’ TB1 terminal block. No connection is required for earth/ chassis ground. ACM3P series ammeters are not internally fused. Terminal block TB1 is to be used only for powering the ammeter's internal circuitry; it must not be used to supply power to external loads. The supply wires feeding these power meters must be fused with a 0.5A/250V time delay/time lag fuse, in accordance with applicable regulatory codes. Wire insulation must be stripped to within ±10% of the stated dimen- sions, and wires should be inserted into TB1 such that their insulation is not pinched by the screw terminal. 7. Current Transformer Phasing: Since the ACM3P only measures am- peres, transformer phasing is not required. ‘Phasing’ refers to the direc- tion of the current-carrying wire as it passes through the primary hole of each of the three built-in current transformers. 8. Connector Torque Ratings: It is important to tighten TB1’s screw- terminals to their rated torque specification of 3.6 pound-inches (0.4Nm). Proper tightening will minimize connector losses and ensure safe, reliable operation. 9. Isolation: Except for the 2-56 thread metallic mounting studs, all of the ACM3P ammeter’s internal components (printed circuit board, resistor, capacitors, current transformers L1, L2 and L3’s secondary leads, etc.) are at the ac-mains potential connected to TB1. ACM3P ammeters are designed to be powered from one ac power-source only. Any other con- nection schemes could introduce significant measurement errors. The three built-in current transformers have a dielectric breakdown rating of 2kV minimum, allowing them to safely monitor 480V, 3-phase ac mains currents. This dielectric rating pertains only to the insulated load-carrying wire as it passes through the built-in CT’s primary hole. However, attention must still be paid to ensure adequate wire-to-wire spacings, and wire-to-metallic surface spacings. Properly rated wiring and fusing must be used for all installations, as noted in Technical Notes 5 and 6 above. IMPORTANT: Even though ACM3P ac ammeters can be used in 480V cur- rent monitoring applications, the ac supply connected to TB1 must never exceed the maximum rating of 264V/47-63Hz. Figure 1. Panel Installation SIDE VIEW 2-56 Hex Nuts (4 places) Tighten each nut to 15 to 20 ozf-in (0.106 to 0.140 N-m). L1 L2 L3 ACM3P PANEL PANEL INSTALLATION All connections to ACM3P ammeters must be made after the unit is securely attached to the panel, and with all associated load and supply voltages de-energized (off), using extreme caution and observing all safety measures applicable to the user’s installation. Care should be exercised when passing conductors through the am- meter’s built-in current transformers L1, L2, and L3. The installed wire- positions should be such that minimal mechanical forces are applied to the current transformers, TB1, or to the ACM3P ammeter itself. In high- vibration environments, it is strongly recommended that strain reliefs be used for all wiring. Using Figure 1 as a guide, carefully insert the ACM3P assembly into the panel opening. From the rear of the panel, install and then tighten the four #2-56 hex nuts over the threaded studs. Tighten each nut to 15 to 20 ozf-in (0.106 to 0.140 N-m). Use only the factory-supplied hardware as the use of substitute hardware could result in an unsafe installation and/or adversely affect the reliability of the installation. The recommended panel thickness range that can be used with the sup- plied hardware is 0.040 inches (1.0mm) to 0.25 inches (6.4mm). Panel thicknesses outside of this range may require additional user-supplied hardware or modifications. www.murata.com-ps/support ACM3P Series Three-Phase AC Ammeters MPM_ACM3P Series.C02 Page 3 of 6 |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |