| 数据搜索系统,热门电子元器件搜索 |
|
77784-R1 数据表(PDF) 15 Page - VAT Group AG |
|
|
|||||||||||||||||||||||||||||
77784-R1 数据表(HTML) 15 Page - VAT Group AG |
|
15 / 19 page ![]() Installation, Operating & Maintenance Instructions Series 64, DN 63-400 (I.D. 21/2" - 16") VAT Vakuumventile AG, CH-9469 Haag, Switzerland Tel +41 81 771 61 61 Fax +41 81 771 48 30 CH@vatvalve.com www.vatvalve.com 219034EM 2013-08-27 15/19 5.1.1 Procedures 1. Precondition for all maintenance work Vent both valve chambers Open gate valve Shut off air supply and electrical power Disconnect all cables to the actuator 2. Removal of the gate assembly (4) / Replacement of the crank bolt (6) / Replacement of the bonnet seal (3) Unfasten the bonnet screws (1) Remove the bonnet plate (2) and the bonnet seal (3) Pull the lever (17) a little bit out of the bonnet opening Loosen the hexagonal socket-head bolt (7) for the crank bolt (6) Remove the crank bolt (6), while lifting the gate assembly (4) a little bit if necessary Slide out the gate assembly (4) carefully from the body and put it on a clean workshop place Re-assemble in reverse direction Fasten the screws (1) crosswise with equal torque: 14 Nm (10 lbf ft) with DN 63 - 100 18 Nm (13 lbf ft) with DN 160 - 400 3. Replacement of the gate O-ring (5) Put a suitable tool beneath the O-ring at the venting hole and lift the O-ring carefully out of the groove (take care that the groove will not be damaged) Clean groove and sealing surface Install new O-ring by pressing it crosswise uniformly into the groove. Make sure, the O-ring is not twisted (pay attention to the seam of the O-ring) 4. Replacement of the ball bearings (24) DN 63, DN 160 - 200: Replace the complete ball bearing assembly (DN 63: 1 pc, DN 160 - 200: 2 pcs) DN 100, DN 250 - 400: Replace each single ball bearing and pull out the its centre ring (4 pcs) 5. Replacement of the locking balls (21) Put the gate assembly (4) carefully on a clean workshop place with the O-ring side to the bottom DN 63: Push center spring down and dismount two-piece circlip from the center bearing. Lift off ball guide plate DN 100 - 400: Unscrew the hexagonal nuts (19). Lift off counter plate (20) and ball guide plate (18) Remove the locking balls (21) |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |