| 数据搜索系统,热门电子元器件搜索 |
|
PWR-2700-DC-R 数据表(PDF) 12 Page - Arista Networks, Inc |
|
|
|||||||||||||||||||||||||||||
PWR-2700-DC-R 数据表(HTML) 12 Page - Arista Networks, Inc |
|
12 / 80 page ![]() • Temperature and Ventilation: For proper ventilation, install the switch where there is ample airflow to the front and back of the switch. The temperature should not go below 0° or exceed 40°C. Important: To prevent the switch from overheating, do not operate it in an area where the ambient temperature exceeds 40°C (104°F). Pour empêcher l'interrupteur de surchauffe, ne pas utiliser il dans une zone où la température ambiante est supérieure à 40°C (104°F). • Airflow Orientation: The fans direct air from the front panel to the rear panel. Orient the front panel toward the cool aisle. • Rack Space Requirements: Table 4: Rack Space Requirements shows the rack space requirements for each of the modular switches. Table 4: Rack Space Requirements Rack or Cabinet (standard 19" EIA) Switch 2-post 4-post Switch Height (RU) DCS-7504N Yes Yes 7 DCS-7508N Yes Yes 13 DCS-7512N No Yes 18 DCS-7516N No Yes 29 Note: The accessory kit provides the required mounting brackets or shelf for each switch. • Power Requirements: Arista switches require a minimum number of operating power supplies in the top section of all chassis, AC or DC and for each power domain of switches with multiple power domains. Refer to Power Supply Specifications for more details regarding your switch. Important: DC cables should be protected with circuit overcurrent protection devices and circuit disconnect means. To power off a unit, power must be disconnected from ALL power cables. DC câbles doivent être protégés avec dispositifs de protection de surintensité circuit et moyens de déconnexion du circuit. Pour éteindre une unité, l'alimentation doit être débranchée de TOUS les câbles d'alimentation. • Other Requirements: Select a site where liquids or objects cannot fall onto the equipment and foreign objects are not drawn into the ventilation holes. Verify these guidelines are met: • Clearance areas to the front and rear panels allow for unrestricted cabling. • All front and rear panel indicators can be easily read. • AC power cords can reach from the AC power outlet to the input connectors. • DC power cables can reach from the DC power distribution unit to the input connectors. 2.2 Tools and Parts Required for Installation The following tools are required to install a modular switch: • Mechanical device capable of lifting chassis being installed (Table 1: Modular Switch Specifications). • Torque reading nut driver (for DC power supplies). • #2 Phillips head screwdriver. • Torque reading screwdriver using #2 Pozidriv or 1/4" flat bit (Needed for PWR-2700-DC-R). 8 |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |