| 数据搜索系统,热门电子元器件搜索 |
|
AD7276ARMZ 数据表(PDF) 19 Page - Analog Devices |
|
|
|||||||||||||||||||||||||||||
AD7276ARMZ 数据表(HTML) 19 Page - Analog Devices |
|
19 / 28 page ![]() AD7276/AD7277/AD7278 Rev. C | Page 19 of 28 To exit this mode of operation and power up the AD7276/ AD7277/AD7278, users should perform a dummy conversion. On the falling edge of CS, the device begins to power up and continues to power up as long as CS is held low until after the falling edge of the 10th SCLK. The device is fully powered up once 16 SCLKs elapse; valid data results from the next conversion, as shown in . If Figure 26 CS is brought high before the 10th falling edge of SCLK, the AD7276/AD7277/AD7278 go into full power- down mode. Therefore, although the device can begin to power up on the falling edge of CS, it powers down on the rising edge of CS as long as this occurs before the 10th SCLK falling edge. If the AD7276/AD7277/AD7278 are already in partial power- down mode and CS is brought high before the 10th falling edge of SCLK, the device enters full power-down mode. For more information on the power-up times associated with partial power-down mode in various configurations, see the section. Power-Up Times Full Power-Down Mode This mode is intended for use in applications where throughput rates slower than those in the partial power-down mode are required because power-up from a full power-down takes substantially longer than that from a partial power-down. This mode is suited to applications where a series of conversions performed at a relatively high throughput rate are followed by a long period of inactivity and thus, power down. When the AD7276/AD7277/AD7278 are in full power-down mode, all analog circuitry is powered down. To enter full power- down mode, put the device into partial power-down mode by bringing CS high between the second and 10 th falling edges of SCLK. In the next conversion cycle, interrupt the conversion process in the same way as shown in by bringing Figure 27 CS high before the 10th SCLK falling edge. Once CS is brought high in this window of SCLKs, the part powers down completely. Note that it is not necessary to complete the 16 SCLKs once CS is brought high to enter either of the power-down modes. Glitch protection is not available when entering full power-down mode. To exit full power-down mode and to power up the AD7276/ AD7277/AD7278, users should perform a dummy conversion, similar to when powering up from partial power-down mode. On the falling edge of CS, the device begins to power up and continues to power up as long as CS is held low until after the falling edge of the 10th SCLK. The required power-up time must elapse before a conversion can be initiated, as shown in . See the section for the power-up times associated with the AD7276/AD7277/AD7278. Figure 28 Power-Up Times Power-Up Times The AD7276/AD7277/AD7278 have two power-down modes, partial power-down and full power-down, which are described in detail in the Modes of Operation section. This section deals with the power-up time required when coming out of either of these modes. To power up from partial power-down mode, one cycle is required. Therefore, with an SCLK frequency of up to 48 MHz, one dummy cycle is sufficient to allow the device to power up from partial power-down mode. Once the dummy cycle is complete, the ADC is fully powered up and the input signal is acquired properly. The quiet time, tQUIET, must still be allowed from the point where the bus goes back into three-state after the dummy conversion to the next falling edge of CS. To power up from full power-down, approximately 1 μs should be allowed from the falling edge of CS, shown in as tPOWER UP. Figure 28 Note that during power-up from partial power-down mode, the track-and-hold, which is in hold mode while the part is powered down, returns to track mode after the first SCLK edge, following the falling edge of CS. This is shown as Point A in . Figure 26 When power supplies are first applied to the AD7276/AD7277/ AD7278, the ADC can power up in either of the power-down modes or in normal mode. Because of this, it is best to allow a dummy cycle to elapse to ensure that the part is fully powered up before attempting a valid conversion. Likewise, if the part is to be kept in partial power-down mode immediately after the supplies are applied, then two dummy cycles must be initiated. The first dummy cycle must hold CS low until after the 10th SCLK falling edge; in the second cycle, CS must be brought high between the second and 10th SCLK falling edges (see ). Figure 25 Alternatively, if the part is to be placed into full power-down mode when the supplies are applied, three dummy cycles must be initiated. The first dummy cycle must hold CS low until after the 10th SCLK falling edge; the second and third dummy cycles place the part into full power-down mode (see ). See the section. Figure 27 Modes of Operation |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |