| 数据搜索系统,热门电子元器件搜索 |
|
TLE6280GP 数据表(PDF) 5 Page - Infineon Technologies AG |
|
|
|||||||||||||||||||||||||||||
TLE6280GP 数据表(HTML) 5 Page - Infineon Technologies AG |
|
5 / 24 page ![]() Datasheet TLE6280GP Vreg1 13V +13 ... +8V CH CL BH 1 BH 2 BH 3 BL 1 BL 2 BL 3 Vreg2=6V Vreg3 = Vreg1-8V Triggered by ILx VS C CP C BH1 C BL1 Phase A Phase B Phase C = Pin Bold line = external component C VS from battery R VS Fig. 2: Supply structure with external components (compare to Fig. 1) rectly feed the low-side output stages and recharge the bootstrap capacitors connected to GND. As soon as the first of the 3 external low-side Mosfets is switched off, the CCP will be pulled down to be re-charged. This synchronous operation with the output stages has the benefit that the electromagnetic emissions generated by the charge pump can be filtered by the same filter necessary to filter the EME of the converter itself. At the same time it is assured that the high voltage at the CH pin is available just in time to charge the high-side bootstrap. IL1 IL2 ! Timing of charge pump - Examples 1 2 1. ILx high 1. ILx low CH Charge of charge pump capacitor IL2 1. ILx high 1. ILx low CH IL1 Charge of charge pump capacitor IL3 Charge of bootstrap capacitors Charge of bootstrap capacitors IL3 5 2004-03-31 Fig. 3: Trigger timing of charge pump caused by changing input signals |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |