| 数据搜索系统,热门电子元器件搜索 |
|
AF32 数据表(PDF) 7 Page - 3M Electronics |
|
|
|||||||||||||||||||||||||||||
AF32 数据表(HTML) 7 Page - 3M Electronics |
|
7 / 8 page ![]() - 7 - Scotch-WeldTM Structural Adhesive Film AF 32 Product Application (continued) Cure Temperature The cure temperature may be varied from 250°F to 450°F (121°C to 232°C), depending on the materials being bonded, equipment available and bond properties desired. The desired pressure must be applied before the glue line reaches 160°F (71°C). The film will soften as temperature is increased to 180°F-210°F (82°C-99°C) and will wet the surface to which it has been applied. A chemical cure will be initiated between 200°F and 270°F (93°C and 132°C) and a low strength gel formed. Continued heating chemically converts this gel into a high strength, solvent resistant bond. Scotch-Weld AF 32 will change color only slightly upon application of heat. Edges of the bond which are exposed to air will change from yellow to rusty brown. Cure Time Cure time depends on the cure temperature used, methods of heat application, production limitations and bond properties required. Since no two bonding operations are exactly alike it is suggested that a few simple experiments be conducted, varying both temperature and cure time to determine optimum conditions for the particular application. Figure II is a guide from which an approximate cure cycle can be taken for various cure times or temperatures. Figure II 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 250°F (121°C) 300°F (149°C) 350°F (177°C) 400°F (204°C) 450°F (232°C) 500°F (260°C) Cure Time (Minutes) A. Optimum bond properties. (Creep resistance, high temperature strength, environmental resistance, etc.) B. General purpose bond properties. (Shear strength over 2,500 psi (17.2 MPa) at 75°F ± 2°F (24°C ± 1.1°C.) C. Cure initiation temperature. A B C Suggested Cure Cycle The following press cure cycle is suggested to obtain dense glue lines and was used to obtain the strengths reported in the Test Data section unless otherwise stated. 1. Apply a pressure of 100 psi (.7 MPa) prior to reaching a bond line temperature of 150°F (66°C) and maintain throughout the press cure cycle. 2. Raise the bond line temperature from ambient to 350°F (177°C) at a rate of 10°F-12°F (5.6°C-6.7°C) per minute. 3. Cure for 120 minutes at 350°F (177°C). 4. Cool to below 200°F (93°C) bond line temperature prior to release of pressure. (In laboratory tests, panels have been removed at 350°F (177°C) with no adverse effects. |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |