| 数据搜索系统,热门电子元器件搜索 |
|
ASTMB545 数据表(PDF) 19 Page - ITT Industries |
|
|
|||||||||||||||||||||||||||||
ASTMB545 数据表(HTML) 19 Page - ITT Industries |
|
19 / 41 page ![]() MIL-DTL-24308G w/AMENDMENT 2 19 TABLE XIII. Lot and sample size. Lot size Sample size 2 to 12 100% 13 to 150 13 151 to 280 20 281 to 500 29 501 to 1,200 34 1,201 to 3,200 42 3,200 to 10,000 50 10,001 to 35,000 60 35,001 to 150,000 74 150,001 to 500,000 90 500,001 and over 102 4.4.2 Retention of qualification. Retention of qualification inspection on connectors shall consist of the examinations and tests shown in table XI. Shipment shall not be held up pending the results of this inspection. 4.4.3 Periodic inspection. Periodic inspection shall consist of group B inspection, except where the results of this inspection show noncompliance with the applicable requirement (4.4.3.1.4). Delivery of products, which have passed group A, shall not be delayed pending the results of these periodic inspections. 4.4.3.1 Group B inspection. Group B inspection shall consist of the inspections specified in table XI, in the order shown. Group B inspection shall be made on sample units which has been randomly selected from inspection lots, which have passed the group A inspection. 4.4.3.1.1 Sampling plan. Group I: Sample connectors consisting of two mated pairs of each class, of each type, of each style of termination, with the largest insert arrangement and all the nonmetallic materials, including lubricants, of one connector of classes D, K, and M for which retention of qualification is desired shall be selected every 36 months. If production of a particular PIN is not current, the group B tests must take place at the time production is resumed. The testing shall revert to the original schedule, which is applied to a newly qualified product. If group B testing on classes G and N, D and M, or G, N, D, M is desired, one completely assembled plug and receptacle of each class shall be subjected to the examinations and tests in lieu of two of a single class. Group II: One each of plug and receptacle with the largest insert arrangement being tested shall be submitted. Group III: Twenty contacts each for pin and socket solder type termination being tested shall be submitted for solderability requirements, and eight pin contacts of each type being tested shall be submitted for contact and pin strength requirements. 4.4.3.1.2 Failures. If any sample units fail to pass group B inspection, the entire sample shall be considered to have failed. 4.4.3.1.3 Disposition of sample units. Sample units, which have been subjected to group B inspection, shall not be delivered on the contract. |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |