| 数据搜索系统,热门电子元器件搜索 |
|
SC412AEVB 数据表(PDF) 12 Page - Semtech Corporation |
|
|
|||||||||||||||||||||||||||||
SC412AEVB 数据表(HTML) 12 Page - Semtech Corporation |
|
12 / 22 page ![]() 12 © 2006 Semtech Corp. www.semtech.com SC412A POWER MANAGEMENT Applications Information (continued) The switching frequency is optimized for 325kHz. The equation for on-time is: TON (nsec) = 2560 • (VOUT/VBAT) + 35 During the DH on-time, voltage across the inductor is (VBAT - VOUT). To determine the inductance, the ripple current must be defined. Smaller ripple current will give smaller output ripple and but will lead to larger inductors. The ripple current will also set the boundary for PSAVE operation: the switching will typically enter PSAVE operation when the load current decreases to 1/2 of the ripple current; (i.e. if ripple current is 4A then PSAVE operation will typically start for loads less than 2A. If ripple current is set at 40% of maximum load current, then PSAVE will commence for loads less than 20% of maximum current). The equation for determining inductance is: L = (VBAT - VOUT) • TON / I RIPPLE Use the maximum value for VBAT, and for TON use the value associated with maximum VBAT. TON = 182 nsec at 20VBAT, 1.1VOUT L = (20 - 1.15) • 182 nsec / 5A = 0.69μH We will select a slightly larger value of 0.7μH, which will decrease the maximum I RIPPLE to 4.91A. Note: the inductor must be rated for the maximum DC load cur- rent plus 1/2 of the ripple current. The ripple current under minimum VBAT conditions is also checked. TON VBATMIN = 2560 • (1.15/10) + 35 = 329 nsec I RIPPLE = (VBAT - VOUT) • TON / L I RIPPLE_VBATMIN = (10 - 1.15) • 329 nsec / 0.7μH = 4.16A Capacitor Selection The output capacitors are chosen based on required ESR and capacitance. The ESR requirement is driven by the output ripple requirement and the DC tolerance. The output voltage has a DC value that is equal to the valley of the output ripple, plus 1/2 of the peak-to-peak ripple. Change in the ripple voltage will lead to a change in DC voltage at the output. The design goal is +/-4% output regulation. The internal 0.75V reference tolerance is 1%, assuming 1% tolerance for the FB resistor divider, this allows 2% tolerance due to VOUT ripple. Since this 2% error comes from 1/2 of the ripple voltage, the allowable ripple is 4%, or 46mV for a 1.15V output. The maximum ripple current of 4.05A creates a ripple voltage across the ESR. The maximum ESR value allowed would be 44mV: ESR MAX = VRIPPLE/IRIPPLEMAX = 46mV / 4.91A ESR MAX = 9.4 mΩ The output capacitance is typically chosen based on tran- sient requirements. A worst-case load release, from maxi- mum load to no load at the exact moment when inductor current is at the peak, defines the required capacitance. If the load release is instantaneous (load changes from maximum to zero in a very small time), the output capaci- tor must absorb all the inductor’s stored energy. This will cause a peak voltage on the capacitor according to the equation: COUT MIN = L • (IOUT + 1/2 • IRIPPLEMAX) 2 / (V PEAK 2 - VOUT2) Assuming a peak voltage VPEAK of 1.230 (80mV rise upon load release), and a 10 amp load release, the required capacitance is: COUT MIN = 0.7μH•(10 + 1/2 • 4.91) 2 / (1.232 - 1.152) COUT MIN = 570μF |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |