| 数据搜索系统,热门电子元器件搜索 |
|
AN1235 数据表(PDF) 10 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
AN1235 数据表(HTML) 10 Page - STMicroelectronics |
|
10 / 14 page ![]() Soldering assembly recommendations AN1235 10/14 Doc ID 7272 Rev 8 5.3 Underfilling Underfilling is not essential for Flip Chips. These devices can do without an underfill if the process temperature does not exceed 175 °C and if the process time is short (typically 5 minutes). 5.4 Manual rework Flip Chips are able to tolerate one repair in addition to the two reflows mentioned in Section 5.2. As for other BGA type packages the use of laser systems is the most suitable form for Flip- Chip repair. Manual hot gas soldering is acceptable but iron soldering is not recommended. For leaded Flip-Chip manual rework the maximum temperature allowed is 260 °C (lead-free compatibility) and dwell time must not exceed 30 seconds. For lead-free Flip-Chip manual rework, the maximum temperature allowed is 260 °C. The typical soldering profile of Figure 9 can be used. 5.4.1 Rework procedure Remove the device Rework process starts with the removal of the device. To remove the device, heat must be applied to melt the solder joints so that the component can be lifted from the board. Large area bottom side preheaters may be used to raise the temperature of the board. This may help to minimize warping of the board, and minimize the amount of heat that must be applied on the component. Top heating may be applied to the component by using a laser or a convective hot gas nozzle. Nozzle size must be selected to match the component footprint appropriately. After top heating has melted the solder, vacuum is applied through the pick-up nozzle, and the component is lifted from the board. The heat should be carefully directed at the component to be removed to avoid adjacent components solder joints being reflowed. Shielding, control of gas flow from the nozzle, and accurate temperature control are the key parameters. Removing solder Next step is cleaning the solder from the work site. Due to space constraints and the need for accurate temperature control, automatic tools are recommended. Typically, site cleaners consist of controlled non-contact gas heating and vacuuming tools. The objective is to remove the residual solder from the site without damaging the pads, solder masks or adjacent components, and to prepare the site for the application of a new component. |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |