| 数据搜索系统,热门电子元器件搜索 |
|
A22Z-R 数据表(PDF) 43 Page - Omron Electronics LLC |
|
|
|||||||||||||||||||||||||||||
A22Z-R 数据表(HTML) 43 Page - Omron Electronics LLC |
|
43 / 52 page ![]() A22E 43 Installation Mounting to the Panel Assembling the Cap (1) Preparing the Panel (2) Mounting the Operation Unit on the Panel • The panel dimensions are shown below. • The panel thickness must be 1 to 5 mm. • Always use a 25-mm-dia. A22Z-R25 Lock Ring for a 25-mm-dia. hole. IP65 degree of protection will be lost if the 25-mm-dia. Lock Ring is not used because of the larger size of a 25-mm-dia. hole. • When painting or coating the panel, make sure that the specified panel dimensions apply to the panel after painting or coating. • Insert the Operation Unit from the front surface of the panel, insert the Lock Ring and the Tightening Nut from the terminal side, then tighten the Ring. Before tightening, check that the rubber washer is present between the Operation Unit and the panel. • Align the Lock Ring with the groove in the casing, then insert the Lock Ring so that its edge is located on the panel side. • Tighten the Tightening Nut at a torque of 1.0 to 2.0 N·m. • When using a Lock Ring, replace with the supplied Lock Ring, insert the projecting part into the lock slot, and then tighten the Tightening Nut. (3) Mounting the Switch on the Operation Unit • Insert the Operation Unit into the Switch Unit, aligning the arrow mark inscribed on the Case with the lever on the Switch Blocks, then move the lever in the direction indicated by the arrow in the following figure. (4) Removing the Switch Emergency Stop Switch • Insert the protrusion of the Tightening Wrench (A22Z-3905) into the Cap slot and then turn to remove the Cap. 22.3 dia. +0.4 0 25 dia. +0.5 0 22.3 dia. +0.4 0 24.1 +0.4 0 3.2 R0.8 max. With Lock Ring Without Lock Ring +0.2 0 Hold here Tightening Nut Lock Ring Rubber Washer Panel Panel Lock Ring Projecting part 1. When the panel cutout dimension is 25 dia., remove the supplied rubber washer and mount the 25-dia. Ring as shown below. (Since the A22Z-R25 is not attached to the main body, order separately.) When using a Legend Plate (Order Separately), do not remove the rubber washer. 22 dia. 22.3 dia. 25 dia. 25 dia. 22.3 dia. 0.5 1.3 Panel Lock Ring Tightening Nut 25-dia. Ring (A22Z-R25) Operation Unit Rubber washer (mounted to Operation Unit) When not using a Legend Plate, remove the rubber washer. (If required) Legend Plates for Emergency Stop (order separately) 2. When the panel cutout dimension is 30 dia., use resin attachment A22Z-A30. Since it is not attached to the main body, order separately. Operation Unit Rubber washer (mounted to Operation Unit) 30-dia. Resin Attachment (A22Z-A30) Rubber washer (included) Mounting panel Lock Ring Tightening Nut Lever Arrow mark Operation Unit • Move the lever in the direction indicated by the arrow in the following figure, then pull the Operation Unit or the Switch Blocks. Since the lever has a hole with an inside diameter of 6.5 mm, the lever can be moved in the specified direction by inserting a screwdriver into the hole and then moving the screwdriver. Screwdriver Cap slot Protrusion |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |