| 数据搜索系统,热门电子元器件搜索 |
|
L9780 数据表(PDF) 28 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
L9780 数据表(HTML) 28 Page - STMicroelectronics |
|
28 / 56 page ![]() Diagnostic L9780 28/56 DocID026356 Rev 3 From a design point of view, to HD pin are connected an 80 μA sink current generator (normally on, except for particular diagnostic conditions) and a 190 μA source current generator (normally off, except for particular diagnostic conditions); possible ranges for generated currents are specified in Table 13. 5.4.1 Heater short to battery When the external heater is in “on” condition, the heater drain is expected to be low (the external heater is considered “on” when the HG voltage value is higher than a specific threshold, defined in Table 13, typical value 4V). If the heater drain voltage value is higher than the heater short to battery threshold (selectable via SPI using bit STBHTH, as defined in Table 13), a possible heater short to battery condition is detected. Possible heater short to battery condition is confirmed by the logic (and reported in the SPI output register) only if the duration of the fault is greater than a filter time, defined as a multiple of the clock period; in other words, when the possible heater short to battery condition is detected, a logic counter starts and when the count reaches the value defined in Table 17 (and selectable via SPI using bit STBHFT[1..0]) the fault condition is considered validated. This counter is reset when the possible short to battery fault is cleared and after every power on reset. Actions Once the heater short to battery fault is validated (the duration of possible fault is greater than the filter time) the following actions are taken: 1. Latch HG off; 2. Set STBH bit in SPI output register. These actions remain valid until cleared by the user. 5.4.2 Heater short to ground When the external heater is in “off” condition, the heater drain is expected to be high. If the heater drain voltage value is lower than the heater short to ground threshold HSG (3.69 V typical value, possible range specified in Table 13), a possible heater short to ground condition is detected. Possible heater short to ground condition is confirmed only if the duration of the fault is greater than a filter time, defined as a multiple of the clock period; in other words, when the possible heater short to ground condition is detected a logic counter starts and when the count reaches the value defined in Table 17 the fault condition is considered validated. This counter is reset when the possible short to ground fault is cleared and after every power on reset. Actions Once the heater short to ground fault is validated (the duration of possible fault is greater than the filter time) the following actions are taken: 1. Set the STGH bit in SPI output register; 2. Latch HG off; 3. Invoke a test of heater open circuit. These actions remain valid until cleared by the user or modified after the open circuit test. |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |