| 数据搜索系统,热门电子元器件搜索 |
|
FS201 数据表(PDF) 22 Page - ABB |
|
|
|||||||||||||||||||||||||||||
FS201 数据表(HTML) 22 Page - ABB |
|
22 / 35 page ![]() 22 System pro M compact ® Residual-current-operated circuit-breakers F 200 series/FS 201 Installation and operation instructions Installation Can be installed in any mounting position due to snap-on fixing to DIN rails EN 50 022, 35 mm width. A If RCD F 200/FS 201 is installed without cross-wiring , hinge the upper part into the DIN rail and push to let the lower part of the device snap into place (1). The device is released in the reverse order, after the quick fastener has been removed with a screw driver (2). B To release RCD F 200/FS 201 that are cross-wired with System pro M compact busbars, first remove the clamping screws. Then, pull the lower part of the F 200/FS 201 forwards (1) and lift it straight up (1a), then, the quick fastener will recede (1b). C The busbar is deallocated and the RCD F 200/FS 201 can be pulled out by lifting the device forwards (2). D The cross-wiring is re-inserted in the reverse order. First, open the clamping screws and pull out the quick fastener until it locks into place for the first time (3). Then, take the RCD F 200/FS 201 and insert it with the rear terminal side onto the pins of the System pro M compact busbar (4), turn it into the direction of the DIN rail (4a) and shift it vertically downwards (4b), to let the quick fastener snap back into place (4c). Attention: Do not forget to re-tighten the clamping screws. Connection Feeder optional, top or bottom. Ensure that conductors are con- nected correctly and firmly. If the 4-pole RCCB is operated as a 2-pole RCCB, use terminals 5 and 7 or, as the case may be, 6 and 8 to make sure that the test button function of the RCCB is working. In the case of a three-phase system with Un = 127/230 V (without neutral N), terminals 4 and 8 must be bridged. Operation F 200/FS 201 is switched ON or OFF with the blue operating lever. C Removal when pro M compact cross wiring remains in place pro M compact busbar pro M compact busbar quick fastener D Insertion when pro M compact cross wiring remains in place A Assembly, disassembly without pro M compact cross wiring B Detaching when pro M compact cross wiring remains in place snap on release pro M compact busbar pin pin Operating test To test proper functioning, press the blue test button when the device is switched ON, the RCCB must trip immediately (the knob jumps into the „0“ switching position). It is necessary to test the RCD halfyearly, if no other regional or user specified additional test are required. |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |