| 数据搜索系统,热门电子元器件搜索 |
|
AN3232 数据表(PDF) 6 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
AN3232 数据表(HTML) 6 Page - STMicroelectronics |
|
6 / 26 page ![]() Epoxy sealed, non-hermetic RF power packages AN3232 6/26 Doc ID 17594 Rev 3 Power RF packages typically require a reliable, low thermal resistance attachment to a heatsink. In this respect, nothing out-performs a direct attachment of the device flange, or thermal base, to the heatsink by means of soldering. This can be accomplished using any of the PbSn or Pb-free soldering methods used throughout the electronic industry. The final soldering step may be preceded by a hot-solder dip of the package base and/or leads, as required for situations that require attention to Au content of the solder joint. Alternatively, the packages may be inserted into an amplifier using a pick-and-place methodology, so that complete soldering is accomplished in a single reflow. Some amplifier assemblies require a manual approach for device positioning on a PCB while soldering bases to copper core heatsinks. In such manual operations STAC boltdown style packages have the unique possibility of serving as a built-in clamp to accomplish both tasks expeditiously. These manual efforts are rewarded by an extremely low thermal resistance, achieved by an ultra-thin solder joint case-to-heatsink, referred to as the RthC- HS. At the same time, the need to allocate valuable amplifier real estate to specialized clamping fixtures is eliminated. The approaches to soldering RF transistors in amplifier housings are as numerous as the quantity of RF package outlines. While the traditional demand for high levels of ruggedness in RF devices assures an intrinsic high tolerance to a wide variety of assembly methods, the high-stress nature of any soldering operation requires careful consideration. Users ultimately assume responsibility for developing and qualifying their soldering processes, and therefore it is strongly recommended to fully evaluate temperature profiles at all steps in the soldering procedure to avoid excessive peak temperatures and ramp rates. When amplifier assemblies require cleaning after soldering operations, the use of a non- reactive cleaning agent is recommended. All residue from reactive flux should be removed according to the flux supplier's recommendations. If a non-aqueous cleaning method is employed, it must be followed by cleaning with DI water to remove all ionic contamination. It is recommended to periodically check the conductivity of the DI rinse to insure that levels of ionic contamination are as low as possible. In cases where heavy ionic contamination is present, multiple DI rinses in isolated baths should be used. Proceed from the most to the least contaminated rinsing system to maximize cleaning effectiveness. In general it is recommended to minimize the use of flux, to use no-clean flux, or to adopt fluxless soldering techniques. When there is doubt as to the behavior of residual flux or flux levels, consider a two-step solder approach. Since the PCB and other components may involve flux, an initial soldering step of the majority of non-critical components can be done, followed by a thorough cleaning. The second solder step, with greatly reduced flux content, can be planned for more critical components such as epoxy sealed RF transistors. An added benefit of a two-step operation is that non-solder thermal interface materials (TIMs), such as thermal compounds, are not influenced by aggressive flux cleaning. Following DI rinsing operations, the entire assembly should be baked, as determined by user experimentation, before power is applied. It is suggested to perform this drying at 125 °C for 24 hrs, if all components are rated for this condition. A longer bake time is recommended at lower temperatures. Refer to Figure 2 for some suggestions. OEM equipment operating conditions should be specified for operation only in a “non- condensating” environment. If there is a question of humidity in ambient conditions in power cycling, a heating/drying cycle is recommended before power is applied. |
|
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |