| 数据搜索系统,热门电子元器件搜索 |
|
STPM10 数据表(PDF) 21 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
STPM10 数据表(HTML) 21 Page - STMicroelectronics |
|
21 / 51 page ![]() STPM10 Theory of operation Doc ID 17728 Rev 3 21/51 energy values is greater than a certain percentage of the averaged energy during the activated tamper module (see Equation 1). This percentage value can be selected between two different values (12.5 % and 6.25 %) according to the value of the configuration bit CRIT. The tamper condition is detected when the following formula is satisfied: Equation 1 EnergyCH1 - EnergyCH2 > KCRIT (EnergyCH1 + EnergyCH2)/2; where KCRIT can be 12.5 % or 6.25 %. The detection threshold is much higher than the accuracy difference of the current channels, which should be less than 0.2 %, but, some headroom should be left for possible transition effect, due to accidental synchronism of actual load current change with the rhythm of taking the energy samples. The tamper circuit works if the energies associated with the two current channels are both positive or negative, if the two energies have different sign, the tamper is on all the time however, the channel with the associated higher power is selected for the final computation of energy. When internal signals are not good enough to perform the calculations, i.e. line period is out or range or ΔΣ signals from analog section are stacked at high or low logic level, or no load condition is activated, the tamper module is disabled and its state is preset to normal. 7.9.1 Detailed operational description The meter is initially set to normal state, i.e. tamper not detected.In this condition the primary channel is selected for final integration of energy. In such state the values of both load currents should not differ more than the accuracy difference of the channels does. Sixty-four periods of line voltage is used as a tamper checking period. After 24 periods of line voltage two internal signals MUX and INH are changed in order to enable secondary current channel and to freeze the last power and RMS values of primary current channel. The following 16 periods of line frequency are used for tamper detection integration. During this gap, the final energy calculation does not use the signal from selected channel but the frozen values. Four line periods after the INH switch, the integration of power from secondary current channel is started and lasts four periods. Additional four line periods later MUX signal is switched back to primary current channel and the integration for tamper detection is started. The timings of MUX and INH signals are shown in Figure 18 below. Figure 18. Timings of tamper module - Primary channel selected MUX Ch 1Ch 2Ch 1Ch 1 INH Tamper power integrators B A Cycles 44 44 24 24 |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |