| 数据搜索系统,热门电子元器件搜索 |
|
L9300 数据表(PDF) 10 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
L9300 数据表(HTML) 10 Page - STMicroelectronics |
|
10 / 178 page ![]() 7 Power up and power down 7.1 Device configuration The device can be configured to work in two different modes through a dedicated pin CONFIG. As the protected battery is available and internal logic is out of reset (POR released), the device senses the connection on the CONFIG pin: in case the pin is grounded the device is configured to work with reduced stby current consumption (no CAN activity during stby) and with a subset of functions disabled in ON state. An external 1 kΩ resistor is highly recommended to implement the connection to limit the risk of parasitic effects in case of ground shifts in the board. Once configured in reduced current consumption mode, the following features are kept disabled: • CAN WAKE-UP • Q&A WATCHDOG The status of CONFIG pin is latched at power-up and available as echo on bit15 (Asic Configuration) of TRKFAULT SPI register; the latched configuration can be reset only by a switch-off of the device: in case CONFIG pin connection is lost during the device activity the status of the device will not change until a new power-up sequence. To avoid additional current consumption from protected battery line when the device is configured in fully functional mode no internal pull-up/down structure is implemented on the pin itself; to latch properly the high configuration on CONFIG pin, CONFIG has to be connected to a power supply available before the ASIC POR release (example: battery line). 7.2 Power up As the protected battery is available the device moves to a stand-by state (STBY): at that point a wake up signal on the WAKE pin is required to turn on the device and to start the regulators power up sequence as in the figure below. The device first enables internal charge pump and VDD1 pre-regulator, the following regulator’s enable signals are delayed until VDD1 reaches the VDD1_ST_en threshold to guarantee they have enough supply voltage to perform slope control and minimize overshoot; this delay is applied independently of the chosen supply for configurable regulators. Regulators enabling are delayed to distribute total in-rush current from supply lines: first regulator enabled after VDD1 is VDD4, followed by VDD3 and finally from VDD2 and TRKn outputs. The latest regulators wait for VDD3 and VDD4 to be out from under voltage conditions to ensure proper configuration latch in case either VDD3 or VDD4 is used as tracking reference. L9300 Power up and power down DS12258 - Rev 5 page 10/178 |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |