| 数据搜索系统,热门电子元器件搜索 |
|
STCMB1 数据表(PDF) 31 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
STCMB1 数据表(HTML) 31 Page - STMicroelectronics |
|
31 / 59 page ![]() DocID028958 Rev 4 31/59 STCMB1 Application information 59 The calculated voltage VHB_Stop will have to be guaranteed by the bulk capacitors after the hold-up time and will be the minimum voltage at which the resonant HB converter will work, and therefore it will be dimensioned according to that minimum voltage. Since the PFC stage is typically designed at the minimum input voltage (and maximum output load), a DC brown-out event could occur at heavy loads, when the input voltage is between the minimum input voltage and the AC brown-out threshold. In fact, in this condition, the PFC is limiting the power delivered and its output voltage could decrease up to the DC brown-out threshold at which the LLC stage is turned off: VOUT will drop and VCC will be discharged. As VCC reaches VCCon, the HV start-up is activated, VCC recharged and operations restarted as VCC reaches VCCon. To avoid the occurrence of a DC brown-out event before the AC brown-out, at the full load, the PFC stage has to be designed at the ACBO threshold rather than at the minimum input voltage. 7.17 HB: timeshift control basic concept The TSC methodology consists in controlling the amount of time TSH elapsing from a zero crossing of the tank current to the next toggling of the half-bridge, as shown in Figure 16. The edge of the square wave voltage commanded at the end of TSH has the opposite sense with respect to that of the current zero crossing that initiated TSH. This ensures that the tank current lags behind the applied square wave voltage and, therefore, that the MOSFETs of the half-bridge work with soft-switching. Figure 16 shows, for example, a negative-going edge of the square wave voltage commanded after a positive-going zero crossing of the tank current (highlighted in blue). Figure 16. Concept of timeshift control and control variable (TSH) range Denoting with the phase shift of the tank current with respect to the applied square wave voltage, Equation 18 relates the timeshift to operating frequency fsw: Equation 18 Under no load conditions, the operating frequency reaches the maximum value fswmax, the switching period is Tswmin = 1/fswmax and the tank current is in quadrature to the voltage ( = / 2; Figure 16, left-hand side), so it is TSH = Tswmin / 4. On the opposite side, at the boundary with the capacitive mode operation, when the current and voltage are in phase s w S H f π π T 1 2 Φ = |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |