| 数据搜索系统,热门电子元器件搜索 |
|
MPFS250T 数据表(PDF) 116 Page - Microchip Technology |
|
|
|||||||||||||||||||||||||||||
MPFS250T 数据表(HTML) 116 Page - Microchip Technology |
|
116 / 128 page ![]() Table 145 • I/O-Related Supplies I/O Power-Up Start Point (V) Supply 0.85 VDDI 1.6 VDDAUX There are no sequencing requirements for the power supplies. However, VDDI3 and must be valid at same time as the main supplies. The other I/O supplies (VDDI, VDDAUX) have no effect on power-up of FPGA fabric (that is, the fabric still powers up even if the I/O supplies of some I/O banks remain powered off). 6.10.4 User Design Dependence of Power-Up Times Some phases of the device initialization are user design dependent, as the device automatically initializes certain resources to user-specified configurations if those resources are used in the design. It is necessary to compute the overall power-up to functional time by referencing the following tables and adding the relevant phases, according to the design configuration. The following equation refers to timing parameters specified in the above timing diagrams. Please note TPCIE , TXCVR, TLSRAM, and TUSRAM can be found in the PolarFire SoC device power-up and resets user guide UG0725. TPUFT = TFAB_READY(cold) + max((TPCIE + TXCVR + TLSRAM + TUSRAM), TCALIB) TWRFT = TFAB_READY(warm) + max((TPCIE + TXCVR + TLSRAM + TUSRAM), TCALIB) Note: TPCIE, TXCVR, TLSRAM, TUSRAM, and TCALIB are common to both cold and warm reset scenarios. Auto-initialization of FPGA (if required) occurs in parallel with I/O calibration. The device may be considered fully functional only when the later of these two activities has finished, which may be either one, depending on the configuration, as may be calculated from the following tables. Note that I/O calibration may extend beyond TPUFT (as I/O calibration process is independent of main device power-on and is instead dependent on I/O bank supply relative power-on time and ramp times). The previous timing diagram for power-on initialization shows the earliest that I/Os could be enabled, if the I/O power supplies are powered on before or at the same time as the main supplies. 6.10.5 Cold Reset to Fabric and I/Os (Low Speed) Functional The following table specifies the minimum, typical, and maximum times from the power supplies reaching the above trip point levels until the FPGA fabric is operational and the FPGA IOs are functional for low-speed (sub-400 MHz) operation. Table 146 • Cold Boot Unit Max Typ Min Power-On (Cold) Reset to Fabric and I/O Oper- ational ms 7.84 4.38 0.92 Time when input pins start working – TIN_ACTIV- E(cold) ms 7.84 4.38 0.92 Time when weak pull- ups are enabled – TPU_ PD_ACTIVE(cold) ms 7.87 4.41 0.95 Time when fabric is op- erational – TFAB_READY- (cold) 112 Microsemi Proprietary and Confidential. DS0147 Revision 1.0 AC Switching Characteristics |
|
链接网址 |
| ALLDATASHEET是否为您带来帮助? [ DONATE ] |
关于 Alldatasheet | 广告服务 | 联系我们 | 隐私政策 | 数据表链接 | 链接交换 | 制造商名单 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |